A site-specific Risk Assessment and Method Statement for groundworkers, ready to edit, brand and send to the principal contractor in minutes.
The groundworker library behind RAMSRight covers the risks principal contractors look for, scored before and after controls.
Email a tracked link to the main contractor, who can download, accept or reject it with comments. At the briefing, operatives sign on your phone and the signatures go straight onto the RAMS.
Start freeA competent person must review and sign every RAMS before work starts.